Your Cart

Your cart is empty

Building wrap

Building wrap — the most visible thing on your project

A facade wrap is seen from further away, by more people, for longer, than anything else a project produces. It is also the item where small production failures are most visible: one drop printed a week after its neighbour and slightly warmer, a join running through a face, a panel that sags because it was hung rather than tensioned. This page is about the three decisions that prevent that.

Send the elevation and a photo of the facadeArea, drop heights and the fixing condition are where we start.

The three things that go wrong

Not the print quality. These.

What goes wrongWhy it happensHow it is prevented
Colour drifts between dropsPanels printed on different days, different rolls, or after a head clean — on a wall read all at once, a small shift is obviousThe whole elevation is printed as one run from one batch, laid out and checked side by side before anything ships
A join lands through a face or a logoThe artwork was designed to the elevation and panelled afterwardsThe panel grid is set from the fixing condition first, and the artwork is laid out onto it
Panels sag or flutterHung from the top and left slack, instead of tensioned on all four edgesEdge tensioning against a frame or a cable line, with reinforcement where the span needs it
Access is booked too lateA wrap needs the same access to install as it does to remove, and both compete with the rest of the programmeAccess is a named line in the quotation and a date in the programme, not an afterthought

A wrap that is right in the factory and wrong on the wall almost always failed at one of these four, and none of them is a printing problem.

Colour across a facade

A brand colour that is approved on a desk proof is judged on a building at a hundred metres, in sunlight, against sky. Two things follow. First, the whole elevation is produced as one run from one material batch, because the difference between two batches is invisible on a sample and plain on a wall. Second, a physical strip is worth more than any on-screen proof: mesh seen against bright sky reads lighter and flatter than the same file on a monitor, which is why a dark corporate blue often needs to be pushed before it looks like itself at height. We print the strip and look at it outdoors before the elevation runs.

How a facade is panelled

  1. 1

    Start at the fixing

    Where the wrap can be anchored — frame, cable line, scaffold or parapet — decides the drop widths before anything else does.

  2. 2

    Set the grid

    Drop heights to the lifts or floor levels, widths to the fixing. Joins land on structure, not through artwork.

  3. 3

    Lay the artwork onto it

    Faces, logos and type positioned clear of the joins. Where an image must cross one, it crosses a quiet part of it.

  4. 4

    Plan for one panel

    Any single panel should be replaceable without taking the elevation down — on a long programme, one will be damaged.

  5. 5

    Number and pack in sequence

    Labelled by drop and position so the crew installs in order instead of unrolling panels to identify them.

What to send us

Five things, and the quotation can be firm rather than indicative.

  • The elevation drawing, or a straight-on photograph with a known dimension in frame
  • Total area, and the drop heights available
  • How the wrap can be fixed — frame, cable, scaffold, parapet, or to be proposed
  • How long it stays up, and any fire classification the specification requires
  • Artwork or brand guideline, including the exact brand colour references

What we say plainly

Panels within the roll width we print in-house are printed, finished and checked in our own factory in Abu Dhabi. On a facade the panels are usually larger than that, and those are produced to our specification and finished, inspected and installed by us. We would rather tell you that now than have you find out from a seam. What is ours throughout is the panel strategy, the colour control, the approvals, the installation and the inspection — which on a wrap is where the visible quality actually comes from.

Questions we are asked

Can the whole facade be one seamless piece?

Practically, no, and you would not want it to be. A facade is panelled so it can be installed by a crew, tensioned properly, and repaired one panel at a time. The craft is in deciding where the joins go, not in avoiding them.

Will the colour match our brand guideline exactly?

We print to the reference you give us and we check a physical strip outdoors before the elevation runs. What we will tell you honestly is that mesh at height against sky reads lighter than the same colour on a monitor or a paper proof, so the strip is the conversation worth having before production.

Can it go up without a scaffold?

Sometimes — from a cradle, a boom lift, or anchored at parapet level — and sometimes not. It depends on the facade, the fixing and the access available. We will tell you which after seeing the elevation, and the access equipment is a named line in the quotation.

What happens in high wind?

That is what the mesh is for. The open area lets wind through instead of loading the fixings. On any wrap we will ask what it is anchored to, because the anchoring, not the fabric, is what fails first when it fails.

Do you remove it afterwards?

Yes, where removal is in scope — and it is worth pricing at the start, because removal needs the same access as installation.